Live database — updated every 6 hours

The live research database for AI infrastructure and hyperscale data centers.

Track every megawatt, every cap-ex announcement, every hyperscaler power deal, every cooling vendor contract, every GPU allocation — in one searchable database. Built for analysts, suppliers, investors, and the AI advertisers who need to reach them.

2,847
Data centers tracked
94 GW
Capacity under management
$612B
2026 cap-ex tracked
38
Public data sources cron'd
Core Database

Companies & Facilities

Hyperscalers, colocation operators, AI cloud providers, cooling vendors, power deal counterparties.

Unlock full database →
Company Category HQ Capacity (MW) 2026 Cap-Ex Latest Move Updated
Amazon Web ServicesHyperscalerSeattle, US11,400$110B$10B Indiana campus expansion2h ago
Microsoft AzureHyperscalerRedmond, US10,200$80BThree Mile Island PPA online4h ago
Google CloudHyperscalerMountain View, US8,600$75BKairos SMR contract signed6h ago
Meta PlatformsHyperscalerMenlo Park, US6,900$65BHyperion 2GW Louisiana site1d ago
EquinixColocationRedwood City, US2,840$12.4BxScale APAC fund III closed9h ago
Digital RealtyColocationAustin, US2,610$9.8BBlackstone JV $7B Phoenix11h ago
CoreWeaveAI CloudRoseland, US1,420$23BPlano TX 1.6GW campus break-ground2h ago
LambdaAI CloudSan Francisco, US410$4.1B$1B credit facility extended1d ago
CrusoeAI CloudDenver, US620$6.2BAbilene TX site Phase 2 power-on3h ago
Vertiv HoldingsCoolingWesterville, US$3.2B liquid cooling backlog5h ago
Schneider ElectricCoolingRueil-Malmaison, FREcoblade rear-door HX launch8h ago
Constellation EnergyPowerBaltimore, US20-yr nuclear PPA w/ Microsoft14h ago
Vistra CorpPowerIrving, USComanche Peak campus deal w/ hyperscaler1d ago
QTS / BlackstoneColocationOverland Park, US1,950$8.5B$25B funding round (private)1d ago
Iron Mountain Data CentersColocationBoston, US730$2.1BVA-1 expansion 90MW2d ago
NTT Global Data CentersColocationTokyo, JP1,420$6.0B██████████ ████ ███████locked
STACK InfrastructureColocationDenver, US1,310$4.8B██████████ ████ ███████locked
Yondr GroupColocationLondon, UK980$3.2B██████████ ████ ███████locked
2,829 more companies behind the paywall. Includes facility-level MW, GPU allocation by site, named power deals, executive contacts, and cron-tracked changes. Start Pro — $29/mo →
Sponsor Slot — Cooling vendor / chip co / colocation operator Reach 38,000+ AI infra decision-makers. Apply for advertiser API →
Research Feed

This week in AI infrastructure

Original analysis sourced from filings, hyperscaler press, FERC dockets, and utility commission filings. Updated daily.

Browse archive →
Power · 4 min read · May 5, 2026

Inside Microsoft's Three Mile Island restart: what the SCO-2 license means for the next 12 hyperscale PPAs

Why the NRC's expedited Crane PPA process is now the template Amazon, Google, and Meta are racing to copy — and the four reactor sites already in negotiation.

Cooling · 6 min read · May 4, 2026

Liquid cooling backlog hits $9.4B: Vertiv, nVent, and the rear-door heat exchanger arms race

GB300 thermal envelopes are forcing 100% direct-to-chip retrofits in 2027. We rank the seven vendors with shippable capacity through Q3 '27.

Cap-Ex · 5 min read · May 3, 2026

Hyperscaler 2026 cap-ex hits $612B — but only 41% lands in compute

Land, power, and substations now eat more cap-ex than GPUs. The full breakdown by hyperscaler, by quarter, by category.

Site Tracker · 3 min read · May 2, 2026

Virginia's Loudoun County is full. Here are the 14 counties absorbing the spillover.

Substation queue analysis across PJM, ERCOT, and MISO with our forecast for which markets clear power requests first.

M&A · 4 min read · May 1, 2026

The $25B QTS recap — what Blackstone is signaling about the next colo cycle

Cap rates, pre-leased MW, and the four other private operators rumored to be next on the auction block.

Chips · 7 min read · Apr 30, 2026

Inside the GB300 → GB400 transition: power density, rack pricing, and what hyperscalers told us off the record

Why the rumored 200kW rack is forcing a complete redesign of distribution at row level. Includes vendor interview notes (Pro+).

Futurist Lab

2-3 year projections

Forecasts grounded in current technology and observable deal flow. No moonshots — just what the data says is coming.

Projection archive →
2026 → 2028

5 of the top 10 hyperscale campuses will be paired with on-site nuclear (SMR or restart) PPAs

Driven by NRC's expedited license process, 4 SMR vendors with signed hyperscaler MOUs, and grid interconnection wait times now exceeding 5 years in PJM.

Confidence 78%
2026 → 2028

Direct-to-chip liquid cooling becomes the default in >70% of newbuild AI campuses

GB300/GB400 thermal envelopes leave no air-cooled path. Vertiv, Schneider, and nVent backlog already exceeds 18 months.

Confidence 88%
2026 → 2027

Single-campus 2GW+ deployments cross 12 sites globally

Meta Hyperion, Crusoe Stargate, OpenAI/Oracle Abilene, and at least three undisclosed Saudi/UAE campuses are already past PPA signing.

Confidence 71%
2026 → 2028

AI cloud "neoclouds" (CoreWeave, Crusoe, Lambda, Nebius) cross $50B combined revenue

Hyperscaler GPU rationing + sovereign AI buildouts continue to push enterprise demand to specialized providers; 3 IPOs likely in window.

Confidence 65%
Pricing

Pick your access tier

Free preview for everyone. Pro for analysts and operators. Enterprise for teams. API for advertisers and AI agents.

Free

$0/forever
  • Top 15 companies preview
  • Weekly research digest
  • 3 article reads / month
  • Read-only futurist summaries
Create account

Pro Most popular

$29/mo
  • Full company database (2,847+)
  • Facility-level MW & cap-ex data
  • Daily research feed (unlimited)
  • All futurist projections + confidence
  • CSV export
  • Email alerts on tracked companies
Start 7-day trial

Enterprise

$499/mo
  • Everything in Pro × 10 seats
  • Slack/Teams alert integration
  • Quarterly analyst briefings
  • Custom watchlists & dashboards
  • Priority data requests
  • SSO + audit logs
Talk to sales

API / AI Advertiser

$0.01/call
  • Programmatic database access
  • JSON + structured for LLM ingestion
  • Sponsored placement endpoint
  • Lead intent + buyer signals
  • Volume discounts at 1M+ calls
  • Co-branded research opportunities
Get API key
For AI Agents & Advertisers

The API hook for the AI ad economy

Every record, every projection, every research piece — addressable via a structured API designed for both LLM ingestion and programmatic ad placement.

# Fetch hyperscaler PPA deals for ad targeting
curl https://api.datacenterpulse.io/v1/companies \
  -H "Authorization: Bearer $DCP_KEY" \
  -d '{"category":"Hyperscaler","filter":"active_ppa"}'

# Sponsored placement (AI advertiser hook)
POST https://api.datacenterpulse.io/v1/sponsored
{
  "campaign": "liquid-cooling-Q3",
  "target_categories": ["Hyperscaler","AI Cloud"],
  "keyword_intents": ["cooling backlog","GB300 thermal"],
  "bid_per_impression": 0.018,
  "creative_url": "https://cdn.example.com/ad.html"
}

Why advertisers buy here

DataCenterPulse readers control the AI infrastructure spend pipeline — hyperscaler procurement, colo site selection, cooling RFPs, power deal negotiation, and chip allocation. There's no cheaper way to put your message in front of every decision-maker in the value chain.

  • 📈 38,000+ verified industry readers
  • 🤖 LLM-readable schema = your brand surfaces in AI assistants
  • 🎯 Intent signals from search + watchlist behavior
  • 💼 Direct line to procurement, not marketing
Apply to advertise